[Jul 28, 2025] ExamTorrent CTS-I dumps & AVIXA Certification sure practice dumps [Q109-Q128]

Share

[Jul 28, 2025] ExamTorrent CTS-I dumps & AVIXA Certification sure practice dumps

AVIXA CTS-I Actual Questions and Braindumps


AVIXA CTS-I Exam Certification Details:

Schedule ExamPearson VUE
Non-Member Exam Price$575(USD)
Duration150 mins
Sample QuestionsAVIXA CTS-I Sample Questions
Number of Questions110
Exam NameAVIXA Certified Technology Specialist - Installation (CTS-I)
Books / TrainingCandidate Handbook


AVIXA CTS-I - Installation Exam Syllabus Topics:

TopicWeight
Duty A: Conducting Pre-Installation Activities20%
Task 1: Review Audiovisual Project Documentation4%
Task 2: Conduct Technical Site Survey4%
Task 3: Prepare for Audiovisual Installation4%
Task 4: Evaluate Overall Facility Readiness4%
Task 5: Conduct On-Site Preparations for Installation4%
Duty B: Conducting Site Rough-In/First-Fix10%
Task 1: Deinstallation of Existing Equipment and cabling2%
Task 2: Mount Substructure4%
Task 3: Pull Cable4%
Duty C: Installing Audiovisual Systems38%
Task 1: Assemble AV Rack4%
Task 2: Wire the AV Equipment Rack5%
Task 3: Distribute AV Equipment4%
Task 4: Mount AV Equipment4%
Task 5: Terminate Cables5%
Task 6: Configure Network Properties of Equipment4%
Task 7: Load Configuration and Control Programs4%
Task 8: Test the AV System4%
Task 9: Calibrate the AV System4%

 

NEW QUESTION # 109
What will a stakeholder analysis help you identify?
Response:

  • A. The changes that were made to the architectural drawings
  • B. The original timeline for the project
  • C. The client's concerns and fears about the AV system
  • D. The GC's budget for the AV system

Answer: C


NEW QUESTION # 110
The published design weight of a speaker array with mounting hardware totals 212 pounds (96 kilograms). What minimum weight should the substructure and mounting assembly be able to support?
Response:

  • A. 500 pounds (227 kilograms)
  • B. 1,060 pounds (480 kilograms)
  • C. 424 pounds (192 kilograms)
  • D. 2,120 pounds (962 kilograms)

Answer: B


NEW QUESTION # 111
Which of the following documents should an AV integrator submit in the event that a manufacturer has discontinued a projector model?
Response:

  • A. Construction change directive (CCD)
  • B. Progress report (PR)
  • C. Request for change (RFC)
  • D. Letter of transmittal

Answer: C


NEW QUESTION # 112
At the end of the project, once installation and verification are complete, acceptance of the completed system is documented in a commissioning report and typically signed by:
Response:

  • A. The contractor and/or the head of the technical staff
  • B. The systems engineer and/or the head of the legal department
  • C. The owner and/or the general contractor
  • D. The head technician and/or the building architect

Answer: C


NEW QUESTION # 113
Which of the following should a maintenance log include?
Select all that apply.
Response:

  • A. Devices replaced
  • B. Name of technician
  • C. Description of problem
  • D. Date of service

Answer: A,B,C,D


NEW QUESTION # 114
Which of the following is true of an IP control system?
Response:

  • A. It works with all models of equipment.
  • B. It runs machine code only.
  • C. It can be connected to equipment over the LAN.
  • D. It is slower than serial control systems.

Answer: C


NEW QUESTION # 115
What is a best practice when selecting fasteners for mounting AV equipment?
Response:

  • A. Use bolts that are extra-long.
  • B. Use bolts with smooth heads.
  • C. Use bolts that are available near the job site.
  • D. Use standards-rated bolts.

Answer: D


NEW QUESTION # 116
A key objective for mounting AV equipment in a rack is to ___.
Response:

  • A. ensure only technical personnel can access it
  • B. hide it discretely in a closet
  • C. roll the gear in and out easily
  • D. protect the integrity of the system

Answer: D


NEW QUESTION # 117
Which device is used for sending the same video signal to multiple destinations?
Response:

  • A. Scan converter
  • B. Line driver
  • C. Matrix switcher
  • D. Distribution amplifier

Answer: D


NEW QUESTION # 118
Which abbreviation on a drawing tells you that you will not need to install a specific display screen?
Response:

  • A. OC
  • B. NTS
  • C. OFOI
  • D. OD

Answer: C


NEW QUESTION # 119
A projector weighing 429 pounds (195 kilograms) should be mounted only to what type of surface?
Response:

  • A. Drywall in conference room
  • B. Ceiling tile of an auditorium
  • C. Front wall in a classroom
  • D. Building structural support or blocking

Answer: D


NEW QUESTION # 120
_____ draws the video image on the display in a sequence of lines from top to bottom.
Response:

  • A. Progressive scanning
  • B. Frame rate
  • C. Refresh rate
  • D. Interlaced scanning

Answer: A


NEW QUESTION # 121
Why is it better to test control systems in the shop?
Select all that apply.
Response:

  • A. It allows more time to fix problems.
  • B. It may provide better access to help from internal teams.
  • C. It allows time for longer breaks.
  • D. It prevents customers from asking questions.

Answer: A,B


NEW QUESTION # 122
What is the industry best practice when troubleshooting?
Response:

  • A. Change the signal analyzer
  • B. Change the faulty device right away
  • C. Change only one thing at a time
  • D. Change the signal generator

Answer: C


NEW QUESTION # 123
Which adjustment on a video wall processor will compensate for the borders between the individual displays?
Response:

  • A. Overscan
  • B. EDID
  • C. Frame rate reduction
  • D. Mullion adjustment

Answer: D


NEW QUESTION # 124
A technician installs a condenser microphone. It is not picking up audio. What is the MOST LIKLEY cause?
Response:

  • A. Phantom power is turned off
  • B. The microphone is defective
  • C. The cable run is too long
  • D. Pins 2 and 3 are swapped at the XLR connector

Answer: A


NEW QUESTION # 125
What devices can interfere with DECT 6.0 wireless microphones?
Response:

  • A. Wireless routers
  • B. Bluetooth devices
  • C. Cordless phones and headsets
  • D. Laptops with Wireless network cards

Answer: C


NEW QUESTION # 126
Which of the following is mic-level voltage?
Response:

  • A. 0.316 volts (-10 dBV)
  • B. to 0.0003 volts (-60 to -50 dBu)
  • C. 1.23 volts (+4 dBu)
  • D. Up to about 100 volts

Answer: B


NEW QUESTION # 127
Which statement accurately describes what you should do when de-installing existing equipment?
Response:

  • A. Remove the connecting cables
  • B. Dispose of equipment right away
  • C. Smash the hardware so that data cannot be stolen
  • D. Call an electronic waste recycling contractor

Answer: A


NEW QUESTION # 128
......

Latest CTS-I Pass Guaranteed Exam Dumps with Accurate & Updated Questions: https://prep4sure.examtorrent.com/CTS-I-exam-papers.html