Latest [Jan 29, 2022] H35-912 Exam Questions – Valid H35-912 Dumps Pdf [Q32-Q47]

Share

Latest [Jan 29, 2022] H35-912 Exam Questions – Valid H35-912 Dumps Pdf

H35-912 Practice Test Questions Answers Updated 175 Questions

NEW QUESTION 32
What are the requirements for construction in hazardous areas? (Multiple choice)

  • A. Provide appropriate safety protection for personnel in hazardous area construction, using special safe working tools
  • B. Erection of warning signs and enclosure isolation measures
  • C. In the construction of hazardous areas, emergency measures and safety measures must be taken

Answer: A,B,C

 

NEW QUESTION 33
The cabinet with the E9000 installed has a minimum depth of 1.2 meters.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 34
Under the engineering service system, which of the following are the responsible persons for safety construction of the project? (Multiple choice)

  • A. Engineering supervision
  • B. Project supervision
  • C. Customer Project Leader
  • D. Project Manager

Answer: B,D

 

NEW QUESTION 35
MA5800 box series, which of the following statements about the environment confirmation are correct? (Multiple choice)

  • A. Confirm that the ODF or MDF has been installed.
  • B. No need to prepare tool and instrument
  • C. Confirm that the equipment grounding bar has been installed.
  • D. Need to confirm that the DC voltage provided by the equipment room should be -38.4V~-57.6V

Answer: A,C,D

 

NEW QUESTION 36
The "High Risk Operation Plan" can be implemented at any time after being reviewed and approved by the technical representative of the customer and the representative office.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 37
For the inspection of PPE, it only needs to be carried out at the site, and it is not necessary to check before departure.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 38
Which of the following statements about copper wire access are wrong? (Multiple choice)

  • A. The equipment room distribution frame does not belong to the copper distribution network.
  • B. The copper wire access consists of three parts: the central office access device, the copper wire distribution network and the user access terminal.
  • C. Twisted Pair is a signal transmission cable made of two or more pure copper wires insulated from each other.
  • D. The corridor distribution box belongs to the copper distribution network.

Answer: A,C

 

NEW QUESTION 39
Which of the following statements about the up-and-down about PON technology is correct?

  • A. PON technology uplink adopted wavelength is 1490nm
  • B. PON technology data downlink uses broadcast
  • C. PON technology data uplink uses broadcast
  • D. PON technology downlink adopted wavelength is 1310nm.

Answer: B

 

NEW QUESTION 40
How many 3.5-inch business hard drives (SATA) does the FusionStorage capacity storage server support?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 41
After the cabinet is unpacked, the forklift can be used to carry and lift the steps if necessary.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 42
When driving, what kind of phone call does we absolutely forbid the driver to use?

  • A. Speakerphone
  • B. Handheld phone

Answer: B

 

NEW QUESTION 43
Site environmental risk assessment requires all personnel to carry out the assessment on the day of the site, or the next day.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 44
What is the high-end storage size of the OceanStor 18000 V3 series (including packaging)?

  • A. 2176mm*10000mm*1465mm
  • B. 2000mm*6000mm*1232mm
  • C. 2000mm*6000mm*1200mm
  • D. 2176mm*1000mm*1465mm

Answer: D

 

NEW QUESTION 45
Which of the following is the general cabinet power-on procedure?

  • A. Single board switch closed -> chassis module power switch closed -> cabinet input power distribution switch closed
  • B. Cabinet input power distribution switch closed -> single board switch closed -> chassis module power switch closed
  • C. Chassis module power switch closed -> cabinet input power distribution switch closed -> single board switch closed.
  • D. Cabinet input power distribution switch closed -> chassis module power switch closed -> single board switch closed

Answer: D

 

NEW QUESTION 46
Which of the requirements must be observed by construction workers belonging to special types of work (eg, work at heights, electricians, welders, etc.)?

  • A. Very experienced, no training and employment permits are required.
  • B. Pass the prescribed safety technology training and assessment, and hold the corresponding employment certificate
  • C. Only need to pass the prescribed safety technology training assessment, no certificate required

Answer: B

 

NEW QUESTION 47
......

H35-912 dumps Sure Practice with 175 Questions: https://prep4sure.examtorrent.com/H35-912-exam-papers.html