PDF (New 2022) Actual SAP C-IBP-2111 Exam Questions [Q12-Q27]

Share

PDF (New 2022) Actual SAP C-IBP-2111 Exam Questions

Dumps Moneyack Guarantee - C-IBP-2111 Dumps UpTo 90% Off

NEW QUESTION 12
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct Answers to this question.

  • A. The calculation chain for a key figure must always result in a calculated key figure.
  • B. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
  • C. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation U level.
  • D. Key figures can be calculated across different planning levels.

Answer: B,D

 

NEW QUESTION 13
You define fixing for a key figure. Which of the following functions are available for this key figure? Note:
There are 2 correct Answers to this question.

  • A. Fixing is possible for a certain quantity of a key figure value.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain period, including all child values in the hierarchy.
  • D. Fixing is possible for manually editable key figures.

Answer: C,D

 

NEW QUESTION 14
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Avoid using telescopic time buckets.
  • B. Split into multiple planning areas to support weekly vs. daily planning needs.
  • C. Use a subnetwork ID to reduce the size of the problem.
  • D. Increase the use of incremental lot size beyond the frozen horizon.

Answer: A,C

 

NEW QUESTION 15
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are
2 correct Answers to this question.

  • A. An advanced demand planning process
  • B. Finite resource planning
  • C. Manual creation of feasible constrained plans
  • D. A basic demand planning process

Answer: B,D

 

NEW QUESTION 16
While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand. Which solution would apply to this scenario? Note:
There are 2 correct Answers to this question.

  • A. Capacity leveling will be possible for production and storage resources.
  • B. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.
  • C. Enough demands can be pulled forward and pull production will occur.
  • D. Excess stock can be generated and will need to be staged in an overflow warehouse.

Answer: B,C

 

NEW QUESTION 17
How can you make charts and dashboards private?

  • A. Choose only relevant key figures and filters in the Analytics Advanced application.
  • B. Enable the relevant settings in the Analytics Advanced and Dashboards Advanced applications.
  • C. Enable the relevant settings in the global configuration parameters.
  • D. Set restrictions for charts in the Permission filter application.

Answer: C

 

NEW QUESTION 18
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be applied to? Note: There are 2 correct Answers to this question.

  • A. Snapshot operator in the SAP IBP add-in for Microsoft Excel
  • B. Supply chain graph in Supply Chain Network app
  • C. Planning view templates in the SAP IBP add-in for Microsoft Excel
  • D. Jobs in the Applications Jobs app

Answer: C,D

 

NEW QUESTION 19
You want to set up demand sensing to analyze demand changes in execution or close to execution windows.
Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.

  • A. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.
  • B. Set up the forecast model to be executed at product-location level.
  • C. It is mandatory to load historical lag-based snapshot data.
  • D. The result generates sensed demand data at the monthly time granularity for the full time horizon

Answer: A,C

 

NEW QUESTION 20
Which of the following solutions are feasible when using the time series supply optimizer? Note: There are 3 correct Answers to this question.

  • A. Not adhering to maximum transport values
  • B. Not respecting production capacity
  • C. Violation of minimum resource utilization
  • D. Violation of minimum aggregated inventory values
  • E. Not-fully satisfied demands

Answer: C,D,E

 

NEW QUESTION 21
NO.21 For which of the following application jobs can you enter planning filters as parameters? Note: There are 2 correct Answers to this question.

  • A. Purge Key Figure Data
  • B. Create Time Periods for Time Profiles
  • C. Purge Master Data
  • D. Purge Non-Conforming Data

Answer: A,C

 

NEW QUESTION 22
How many different time levels can be selected within one planning view?

  • A. Only base time levels of the planning area
  • B. All time levels available in the time profile
  • C. Only time levels from the base planning level of selected key figures
  • D. All time levels available in the time profile, restricted by global configuration parameter

Answer: D

 

NEW QUESTION 23
Which library is used by the forecasting engine for the demand sensing algorithm?

  • A. Predictive analytics library
  • B. Supply chain algorithm library
  • C. Demand library
  • D. Heuristics library

Answer: B

 

NEW QUESTION 24
Where can we see the results of Time Series analysis in SAP IBP?

  • A. Time Series Property Attribute in Customer
  • B. Time Series Property Attribute in Customer Source
  • C. Time Series Property Attribute in Product
  • D. Time Series Property Attribute in Customer Product

Answer: C

 

NEW QUESTION 25
A time profile is defined with the levels of day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other buckets?

  • A. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • B. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • C. IF("PERIODID3" ="$$PERIODID3CUSS...)
  • D. IF("PERIODID4" = "SSPERIODID4CU$$...)

Answer: D

 

NEW QUESTION 26
You are modeling the introduction of a new product using Lifecycle Planning functionality in SAP IBP.
What is mandatory to create in your planning area for the setup of reference product(s) to work? Note:
There are 2 correct Answers to this question.

  • A. Definition of an attribute representing the product ID
  • B. Definition of Actual Sales business meaning for one key figure
  • C. Definition of an attribute representing the product description
  • D. Planning objects for the new product

Answer: A,D

 

NEW QUESTION 27
......


SAP C-IBP-2111 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Configure supply planning, run various solvers to generate planning results
  • Supply and Response
Topic 2
  • Create statistical forecast using historical data with basic methods
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
Topic 3
  • Describe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans
Topic 4
  • Create and use key figures and attributes
  • Key Figures & Attributes
Topic 5
  • Display, create, copy, edit, check, and activate a planning area
  • General Configuration of a Planning Area
Topic 6
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Demand Planning. Solution Architecture. S&OP Review
Topic 7
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets

 

Updated Nov-2022 Pass C-IBP-2111 Exam - Real Practice Test Questions: https://prep4sure.examtorrent.com/C-IBP-2111-exam-papers.html