[Sep-2023] HQT-4180 Dumps are Available for Instant Access from ExamTorrent [Q16-Q34]

Share

[Sep-2023] HQT-4180 Dumps are Available for Instant Access from ExamTorrent

Study resources for the Valid HQT-4180 Braindumps!


Hitachi HQT-4180 certification exam is an important credential for professionals seeking to enhance their careers in the IT industry. Hitachi Vantara Qualified Professional - VSP Midrange Family Installation certification exam is designed to test the knowledge and skills of individuals in the installation and configuration of Hitachi Vantara's VSP Midrange Family solutions. HQT-4180 exam is ideal for professionals who aspire to work with midrange storage solutions and want to demonstrate their expertise in Hitachi's products.

 

NEW QUESTION # 16
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?

  • A. Check if the status of the PS is blocked, and if yes, then replace it directly.
  • B. Use the MPC for blocking the PS, then replace it.
  • C. Use the Maintenance Utility for blocking the PS, then replace it.
  • D. Use the Maintenance Utility for blocking the controller, then replace the PS.

Answer: B


NEW QUESTION # 17
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers

  • A. upgrading from G200 to G800
  • B. upgrading from G200 to G600
  • C. adding a DB60 drive tray
  • D. adding a DKB

Answer: C,D


NEW QUESTION # 18
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?

  • A. two BM35 per controller
  • B. two BM35 per system
  • C. one BM45 per controller
  • D. two BM45 per controller

Answer: D


NEW QUESTION # 19
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

  • A. Enable Port Security.
  • B. Create a Host Group.
  • C. Enable Host Group security.
  • D. Scan for all WWNs.

Answer: D


NEW QUESTION # 20
You need to replace a broken disk drive on a VSP G700.
What are two prerequisites? (Choose two.)

  • A. The Drive Box where the drive is located must be powered down.
  • B. The red LED on the drive must be lit.
  • C. You must use the Replace button in the Maintenance Utility before removing the drive.
  • D. You must wear a wrist strap for ESD protection.

Answer: C,D


NEW QUESTION # 21
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)

  • A. Initial Setup Wizard
  • B. Maintenance Utility
  • C. HSA Embedded
  • D. Storage Navigator

Answer: A,B


NEW QUESTION # 22
A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.
Which two actions are automatically performed by the system? (Choose two.)

  • A. Dynamic Sparing is started.
  • B. An alert is generated.
  • C. The Correction Copy process starts.
  • D. The RAID group is placed in Correction Access.

Answer: A,B


NEW QUESTION # 23
Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

  • A. 4D + 1P
  • B. 7D + 1P
  • C. 8D + 1P
  • D. 10D + 2P
  • E. 2D + 2D

Answer: A,C,D


NEW QUESTION # 24
You need to upgrade the firmware on a VSP G700.
Which file must you select to perform the upgrade using the Maintenance Utility?

  • A. setup.exe
  • B. HA-MPC-xx.iso
  • C. HA-SVP-xx.iso
  • D. All Firmware.mda

Answer: C


NEW QUESTION # 25
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

  • A. Perform Self-Service Maintenance.
  • B. Configure the Hitachi Remote Ops Monitor Agent.
  • C. Manage virtual storage machines.
  • D. Manage multiple VSP Midrange storage systems.

Answer: A,B


NEW QUESTION # 26
Which tool can be used to change System Option Modes (SOMs)?

  • A. MPC software
  • B. HSAe
  • C. Webconsole
  • D. Hitachi Ops Center

Answer: A


NEW QUESTION # 27
A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)

  • A. Slots B of both controllers must be available for DKB installation.
  • B. Drive Boxes (DBs) with SAS interface have to be added.
  • C. Two additional Disk Boards (DKBs) have to be installed.
  • D. The SAS Expansion license has to be installed.
  • E. In Shared Memory, the Extension1 has to be enabled.

Answer: B,C,D


NEW QUESTION # 28
You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.
What are two requirements? (Choose two.)

  • A. The CHBs must be updated first.
  • B. The Microprocessor utilization should be below 50%.
  • C. There should be no sparing processes running in the background.
  • D. The Cache Write Pending rate should be below 30%.

Answer: A,C


NEW QUESTION # 29
Which manual should be used when performing maintenance actions on VSP midrange storage systems?

  • A. Product Documentation Library
  • B. Administrator Guide
  • C. Maintenance Manual
  • D. Service Guide

Answer: C


NEW QUESTION # 30
......


By earning the Hitachi Vantara Qualified Professional - VSP Midrange Family Installation certification, professionals can demonstrate their expertise in designing and implementing storage solutions that meet the needs of their organization. Hitachi Vantara Qualified Professional - VSP Midrange Family Installation certification is highly valued by employers and can lead to career advancement opportunities, increased job security, and higher salaries.

 

Updated HQT-4180 Tests Engine pdf - All Free Dumps Guaranteed: https://prep4sure.examtorrent.com/HQT-4180-exam-papers.html